16m High Mast Steel Utility Power Poles High Voltage Pole With Aluminum Conductor
electrical power poles
,electrical transmission poles
16m High Mast Steel Utility Pole Electric Power Poles Aluminum Conductor
Product Name | Hot Dip Galvanized Medium Voltage Steel Utility Pole With 50000m Aluminum Conductor |
Type | Straight Pole ,Tensile Pole ,Turn Pole |
Suit for | Electricity distribution |
Shape | Conoid ,Multi-pyramidal,Columniform,polygonal or conical |
Material | Usually Q345B/A572,minimum yield strength>=345n/mm2 |
Torlance of dimenstion | +- 2% |
Power | 10 KV ~550 KV |
Safety Factor | Safety factor for conducting wine : 8 |
Design Load in Kg | 300~ 1000 Kg appliced to 50cm from the to pole |
Marks | Nane palte through rivert or glue ,engrave ,emboss as per customer requirement |
Surface treatment | Hot dip galvanized Following ASTM A 123, color polyester power or any other standard by client required. |
Joint of Poles | Insert mode,innerflange mode,face to face joint mode . |
Design of pole | Against earthquake of 8 grade |
Wind Speed | 160 Km/Hour . 30 m /s |
Minimum yield strength | 355 mpa |
Minimum ultimate tensile strength | 490 mpa |
Max ultimate tensile strength | 620 mpa |
Standard | ISO 9001 |
Length of per section | Within 14m once forming without slip joint |
Welding | We has past flaw testing.Internal and external double welding makes the welding beautiful in shape |
Thickness | 1 mm to 30 mm |
Production Process | Rew material test → Cuttingj →Molding or bending →Welidng (longitudinal )→Dimension verify→Flange welding →Hole drilling →Calibration → Deburr→Galvanization or powder coating ,painting →Recalibration →Thread →Packages |
Packages | Our poles as normal cover by Mat or straw bale at the top and bottom ,anyway also |
Before shipment ,we have a final inspector manager to check the products on every detail and component to make sure it all meet the drawing .
Trade Terms:
1. Payment:(1)Telegraphic Transfer(30% advance payment, balance before shipment)
(2)Telegraphic Transfer(30% advance payment, balance against copy of documents)
(3)Letter of Credit: at sight
2. Lead Time: 2 weeks after confirmed order
3. Delivery way: by sea